Quick answer
For your first Permits task, do not change many settings: run defaults once, then adjust one item at a time. Structure/electrical/elevator may need permits/inspection.
Why it matters
Change one variable at a time so you know which setting matters.
Structure.
Step by step
- Check floors/shaft/type/electrical/permits/space.
- Separate equipment/shaft/install/electrical/remodel.
- Get 2-3 quotes; confirm type/install/warranty.
- Contract states scope/shaft/payment/warranty.
Common mistakes
- Equipment price only, not shaft/install.
- Ignoring floors/electrical/permits.
- Not checking maintenance/warranty.
- No shaft/payment terms.
Checklist
- Floors/shaft/type/electrical/permits.
- Equipment/shaft/install/remodel.
- Space/structure/safety/maintenance.
- Warranty/payment/contract.
- Budget/accessibility/resale.
Key facts
- Structure.
- Electrical.
- Inspection.
FAQ
How do I start with Permits?
For your first Permits task, do not change many settings: run defaults once, then adjust one item at a time. Structure/electrical/elevator may need permits/inspection.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: Angi